1. Use the U.S. proposal workspace.
Use this guide when: you have owner or operator permission and want Ashley to review a U.S. event idea in USD. The form uses a U.S. state or territory selection. For a private brief in another country, use the private show plan guide instead of choosing a false U.S. location.
Start a proposal.
Select Pitch an event or New pitch. Artist and venue account permissions do not include proposal submission. Changing a perspective in the private planner will not unlock it.
The four steps are Market, Audience, Budget and Review. You can save an incomplete draft before filling required fields. Submitting requires the marked fields and valid values.
A fictional organizer’s first draft.
Worked example only / No real show or offer
Alex’s Omaha show idea
Alex is an imaginary U.S. organizer. The person, “Sample Room,” show idea and all numbers below are invented. They are not actual availability, market prices, artist commitments or evidence of demand. This example does not create a draft in your account.
- Market
- Omaha, Nebraska · “Sample Room,” an invented venue
- Capacity and attendance
- 200 capacity; 120 expected attendees, an unverified assumption
- Proposed talent
- “Artist to identify; no one contacted or confirmed.”
- Date and demand evidence
- Still to check; do not invent an audience source or a confirmed date
- Next action
- Check room availability, collect relevant demand evidence and firm up cost estimates.
Useful stopping point: Alex chooses Save draft, checks the confirmation and stops before submission. The incomplete draft is private. It has not reserved the room or promised anyone a show.
2. Save when you need to pause.
Choose Save draft, even with fields blank. Wait for the message confirming that the draft was saved privately to your account. There is one saved U.S. proposal draft per account, separate from your submitted proposals and private show plans. There is no autosave; use the button again after edits.
- Return later: sign in to the same account and use Load saved draft if needed. Loading replaces the page’s unsaved edits, so preserve any notes you need first.
- Another tab saved a newer version: keep a private copy of your current notes, then load the saved draft, compare it and re-enter the changes you want. The tool will not silently merge competing edits.
- A save or submission result is uncertain: keep your notes. Use Refresh access and check the saved draft or Event pipeline before trying again. An error does not prove that nothing was saved or submitted.
- Start over: Clear draft asks before clearing the page and marking the saved draft discarded. It does not remove submitted proposals or promise permanent deletion.
Do not rely on an open tab as storage. Unsaved work can be lost on closing the page or losing verified account access, and offline actions are not queued for later.
3. Explain the room and the audience.
Market
Enter the event title, city, state, proposed date, venue, capacity, expected attendance and proposed talent. Expected attendance cannot exceed capacity. Say what is tentative and whether any artist has actually been contacted; “proposed” is not “confirmed.”
Audience
Add average ticket price in USD, requested operator compensation and requested operator bonus. Enter zero only if no amount is requested. These are requests, not accepted compensation.
For audience evidence, identify relevant past attendance, local partnerships or source links and dates. Explain why they apply to this idea. For the marketing plan, say who would do what, through which channels and when. If evidence is still missing, keep a draft rather than presenting a guess as verified demand.
Use Back to check earlier steps. If a field needs correction, fix the identified value; you do not need to start again.
4. Include the whole cost picture.
In Budget, enter explicit USD estimates for talent, venue, production, marketing and other costs. Zero means you expect no cost in that category. Use the notes for assumptions and items still to confirm, including applicable taxes, fees, insurance, security and contingency.
Operator compensation is shown separately.
The event-cost subtotal excludes the requested operator fee and bonus. Count the relevant compensation when deciding all costs the show needs to cover. Do not mistake the subtotal for a complete budget.
Fictional arithmetic / Not a quote or earnings forecast
Alex checks the assumptions.
- Talent / venue / production
- USD 650 / 250 / 150
- Marketing / other
- USD 100 / 50
- Event-cost subtotal
- USD 1,200
- Requested fee / bonus
- USD 150 / 0, separate from that subtotal
- Assumed costs to cover
- USD 1,350, if these are all relevant costs
If Alex separately assumes USD 12 net revenue per ticket, the break-even calculation is 1,350 ÷ 12, rounded up: 113 tickets. That is arithmetic, not evidence that 113 tickets will sell or cash will arrive in time to pay bills.
Use the Scenario planner carefully.
Enter Sellable capacity, Net revenue per ticket (USD) and Total costs to cover (USD). Unlike the private planner’s face-value scenario, this calculator expects your net ticket figure after relevant per-ticket deductions.
Include every relevant cost yourself, including artist guarantees and per-ticket obligations. Do not count a fee twice if it is already deducted from net revenue. Taxes, refunds, fees and revenue shares are not automatically added. Test lower attendance, and check cash timing separately. These calculations stay on the page and are not saved or submitted as the proposal.
5. Check everything before sending.
Review the values.
Choose Review proposal. Check the market, audience assumptions, event-cost subtotal and separate requested compensation. Confirm that every estimate is identified and no private documents or payment information are in the text.
Submit when ready for review.
Select Submit pitch for review. This sends the proposal for review. It does not accept a contract, confirm a booking, reserve a date, provide funding or authorize spending.
Verify the outcome.
Wait for the submission confirmation and find the proposal in Event pipeline. If the result is uncertain, check the latest records before retrying. Do not assume a connection error means no proposal was created.
You are done with this step when: the proposal is visible in the pipeline with its review status. A confirmed submission is not a confirmed show.
6. Follow the actual next steps.
Read Review & next steps on the proposal when feedback appears. If it is marked Needs revision, use the revision action offered on that proposal and review the changed information before resubmitting.
If the saved attendance or cost breakdown cannot be recovered reliably, the form shows a warning and keeps the complete original text in Audience evidence. Read that text, re-enter the attendance, cost breakdown and budget notes, then review the subtotal before resubmitting. A copied example is not proof of the current budget, and the form will not guess between ambiguous matches.
Approved plan remains a planning status. Check separate agreements, artist and venue confirmation, funding and payment arrangements before proceeding. Requested fees are not automatically accepted or paid.
Pipeline counts and status filters apply to loaded proposals. Select Load more proposals when it appears to see older entries.
Under Shared events, assigned members can read event logistics entered by Ashley. Every active member assigned to the event can see those notes. This does not share your private draft, owner financial records or every agreement. Ask Ashley to check an assignment if an expected event is missing.
Owner reconciliation uses manually entered records and evidence references. It does not pull a live ticketing feed or transfer money. Keep bank details, identity documents, tax forms and passwords out of proposals and shared logistics.
In OWNER ONLY · PRIVATE REVIEW, leave a financial figure or ticket count blank if it is unknown. Enter 0 only to record a known zero. Revenue less costs is shown only when both figures are known for the current proposal revision. Prior figures and older automatic defaults are labeled reference values; they are not copied into a changed proposal. These owner-entered planning figures do not verify bank funds or update the separate reconciliation record.