E02 INDEPENDENT FINDINGS — 2026-10-06 Verdict The frozen conditional reset calculation passes 700 independent checks. This verifies its inputs, formulas, numerical outputs and stated rejection gates. It does not validate a powered mechanism, repeated specimen impacts, a motor, an electrical system, safe operation or physical capture. The independent reviewer is a separate computational implementation within this project, not an outside laboratory or external experimental replication. What was checked All 112 specified rows occur exactly once: 16 conditional calculations, 84 pickup-ineligible rows and 12 timing rejections. No numerical failures were found. All 16 work ledgers agree with separately expressed adaptive quadrature; all force/power extrema agree with a separate extrema search within the specified tolerances. All 16 exported profiles, each with 257 rows and 15 columns, agree with independently evaluated position, motion, force and energy expressions. Original and final source/input/output hashes agree. The original eight fine E01 traces were independently reconstructed. Only I02 and I03 satisfy the inherited final-50ms rest gate, and both are missing-target captures. None of the target-present E01 cases is eligible. I05's small final speed is not enough: its motion window and force balance fail. I04's lower boundary crossing remains a failure. No velocity or beam state was snapped to zero. The equilibrium lift is explicitly a separate counterfactual; the actual terminal state and its residual differences remain reported. Why faster timing changes the mechanism problem The prescribed protocol reserves 0.60 seconds for the inherited observation window and an unmeasured 0.04 seconds for engagement/disengagement. At 60 BPM this leaves 0.36 seconds for lifting; at 90 BPM it leaves only 0.026667 seconds. Independent inherited-guide-only examples: Case / commanded cadence | peak speed | peak moving KE | peak absolute force I02 / 60 BPM | 0.453 m/s | 1.232 mJ | 0.168 N I03 / 60 BPM | 0.479 m/s | 2.297 mJ | 0.282 N I02 / 90 BPM | 6.118 m/s | 224.571 mJ | 8.624 N I03 / 90 BPM | 6.470 m/s | 418.596 mJ | 15.169 N At 90 BPM, I02 needs 231.865 mJ positive mechanical work and absorbs 217.397 mJ; I03 needs 430.055 mJ and absorbs 407.289 mJ. Their net works are much smaller, 14.468 mJ and 22.766 mJ. Net work alone would therefore conceal the large transient energy and braking demand. The 20 mJ gravity-descent bound is not a bound on powered reset energy. The separate additional-drag rows are retained. Force reversal requires a positively attached drive capable of both directions for the fast ideal profile. A pull-only cable or passive cam follower cannot be assumed equivalent. Absorbed mechanical work is not a battery recharge claim. Holding power, motor/gear/gripper inertia and losses, controller power, release-pin loads and actual latch/actuator timings remain unmodeled. Cadence is a repetition command, not the specimen's resonance frequency. The inherited beam's lowest mode is approximately 27.22 Hz; this study does not optimize impact phase or prove resonant efficiency. Timing rejection is only under the declared fixed protocol; it is not a universal physical speed limit. Next evidence needed Measure moving mass, guide breakaway/running drag, capture load-unload behavior and residual motion. Design and test positive pickup, release, pin withdrawal, force capacity, absorbed-energy handling and measured actuator timing. A calibrated active capture/return model or adequately settled target-present state is needed before repeated specimen impacts can be modeled credibly. No manufacture-ready repeat exciter or fracture capability is established. Counts New dynamic trajectory integrations: 0. New repeated-impact integrations: 0. Physical trials: 0. Independent reviewer unit tests: 12, all passing. The 112 rows, 16 prescribed profiles and 700 checks are different counts and must not be added together as experiments or physical tests.