E02 pre-run interpretation addendum
=================================
Written before the E02 matrix calculations. The frozen112-row plan, cadence grid
and pass/fail thresholds are unchanged.

An independent reviewer identified a necessary diagnostic: the powered reset has
its own peak moving kinetic energy. The E0120mJ gravity-descent bound is NOT a bound
on a fast powered upward lift. Report analytic peak reset kinetic energy alongside
peak speed and a clearly non-gating comparison against20mJ. A numerically accepted
row does not establish safe operation, actuator capacity or a retained20mJ envelope.

Report sampled minimum and maximum signed actuator force. A trajectory needing
downward as well as upward force requires a bidirectional positively attached ideal
actuator. It cannot be described as achievable by a tension-only cable or passive
cam follower. No such actuator, gripper, pin drive or controller has been selected.

The hypothetical pickup and release timing assumptions do not establish that the
pin can clear its separate>=34mm withdrawal travel. Holding/electrical energy is
unmodeled, and the existing acoustic amplifier chain is not an impact reset drive.