M02 independent computational review — final findings

All 995 evidence/field reconstruction checks pass. A separate 206-check final
resource and screen reconciliation also passes. These are checks of calculation
and reporting fidelity, not 1,201 physical tests and not an accuracy waiver.

The author completed exactly 3 generalized eigensolutions and 36 direct harmonic
reference solves in 39 numerically valid rows. Nested 24/48/96/144 cutoffs share
each eigensolution. Through final manifest writing, execution took 86.578 s.
The fixed parent n8 replay agrees with M01. All frozen source/input hashes match.

Before outcomes, the reviewer selected the new n10 steel mesh at 100 kHz. A
separate Cartesian-tensor assembly and unreduced complex solve agrees with the
author displacement field to 2.981e-14 in the consistent-mass relative norm.
The reviewer also independently reconstructs all saved compliance curves,
all 36 direct-vector tensor stresses and energy measures, projection-based
modal-error identities, acceptance flags, planned IDs and manifest hashes.
This is independent implementation within the same project, not an outside lab.

Numerical accuracy remains insufficient for a whole-band prediction:

* First-six frequencies: n8-to-n10 maximum shift 1.7334%, and n10-to-n12
  1.0126%; both meet the original 2% screen.
* Whole-band complex compliance at 144 modes: n8-to-n10 difference 218.531%,
  and n10-to-n12 155.515%, both failing the 5% screen. The metric uses the
  predeclared 1%-of-peak denominator floor and compares numerical models;
  it is not a percentage error against physical measurements.
* At n12, the scalar-compliance 96-to-144 cutoff difference is 2.996%, passing
  the 5% criterion. However, full-displacement direct-reference comparisons
  at the same 144 modes fail at 160 kHz (5.2172%) and 180 kHz (8.4325%).
  Scalar-output agreement does not establish complete displacement accuracy.
* Across all meshes, four of the 36 direct comparisons at 144 modes fail:
  n8/180 kHz, n10/180 kHz, n12/160 kHz and n12/180 kHz. All remain visible.
* Passing direct spatial comparisons at 20 kHz describes that named point.
  The 12 prescribed direct frequencies do not establish continuous-band maxima.

Resource history remains explicit. The first author preflight passed 28/29 tests;
its over-limit Windows peak-counter assertion failed. A separate bounded probe
read back a 64 MiB configured job limit, observed an 8 MiB allocation succeed
and free, and a 256 MiB VirtualAlloc request fail with NULL/error1455. Current
private commit remained unchanged after refusal, while Windows reported an
over-limit peak. The docs checked do not explain the counter discrepancy.
The counter is retained without calling it an admitted-memory measurement.
The replacement test checks configured limits and actual allocation rejection;
the 4 GiB/600 s main budget and all scientific thresholds were unchanged.
Fresh preflight-v3 passed 29/29 tests with zero skips before the main run.
Working-set and combined coordinator/worker monitoring are sampled at 0.1 s,
not continuous hard resident-memory limits.

The material is the same ideal homogeneous isotropic 20 mm steel cube under
1 N peak distributed top traction with a fully fixed bottom and assumed
Rayleigh damping. There is no hardware coupling, fracture, physical specimen
calibration, hardness model or proof for other material/size combinations.
Physical trials: zero. The reviewer direct solve is not added to the author
matrix count. No source, numerical result or prior evidence was altered.
